Critical Path - Eminence

Critical Path - Eminence

  • Jaar van uitgave: 2013
  • Taal: Engels
  • Duur: 3:39

Hieronder staat de songtekst van het nummer Critical Path , artiest - Eminence met vertaling

Tekst van het liedje " Critical Path "

Originele tekst met vertaling

Critical Path

Eminence

Originele tekst

I can get this odd feeling out of my mind

I can get this vison of disoder out of my head

We don’t know when our time on earth will end

I will breath until my dying day

This empty and sickning feeling won’t to go away

Nothing will deter me.

I’ll walked down to hell

I rushed through the path

Bullet shot out of hate

The feeling was so overwelming

I hated outside into the rain

This empty and sickning feeling won’t to go away

Nothing will deter me.

I’ll walked down to hell

You can try to survive by yourself

You can try to deny by yourself

Now is time to wake up

No panic in the air

Liedvertaling

Ik kan dit vreemde gevoel uit mijn hoofd krijgen

Ik kan dit visioen van wanorde uit mijn hoofd krijgen

We weten niet wanneer onze tijd op aarde zal eindigen

Ik zal ademen tot mijn sterfdag

Dit lege en misselijkmakende gevoel gaat niet weg

Niets zal me afschrikken.

Ik liep naar de hel

Ik rende door het pad

Kogel geschoten uit haat

Het gevoel was zo overweldigend

Ik haatte buiten in de regen

Dit lege en misselijkmakende gevoel gaat niet weg

Niets zal me afschrikken.

Ik liep naar de hel

Je kunt zelf proberen te overleven

U kunt zelf proberen te weigeren

Nu is het tijd om wakker te worden

Geen paniek in de lucht

Meer dan 2 miljoen songteksten

Liedjes in verschillende talen

Vertalingen

Hoogwaardige vertalingen in alle talen

Snel zoeken

Vind binnen enkele seconden de teksten die je nodig hebt